Samuel U. Rodgers Health Center
Client: Rogers Health
Location: Kansas City, Missouri
TSi provided subsurface exploration and geotechnical engineering services for the design and construction of this new healthcare center in Kansas City.
The structure is a two-story, 40,000-square-foot building. TSi professional staff provided 16 borings at the project site as well as a laboratory testing program.
TSi prepared a geotechnical study report.
St. Louis University Replacement Hospital
Client: Stock & Associates, Inc.
Location: Fenton, Missouri
TSi provided construction observation testing for a new hospital for SSM Healthcare located in the northwest quadrant of the intersection of Route 141 and Bowles Avenue in Fenton, Missouri. The new hospital required development of an existing golf course that included more than 45 acres of land, including deep fills over a former lake area. Buidings on the site included a 154 bed hospital, ,
the St. Francis Medial Office Building, and the St. Joseph Outpatient Surgery Center.
Fulton State Hospital
Client: State of Missouri
Location: Fulton, Missouri
TSi performed a subsurface exploration and geotechnical engineering evaluation for use in the design and construction of the proposed Fulton State Hospital in Fulton, Missouri. This new maximum-security facility for severely mentally ill patients is scheduled to open in Spring 2018. The construction value of the total program is $211 million. The building will be a four-story, 413,000-square-foot facility and will feature 300 beds. Construction was started Spring 2015, with estimated completion 12/2017.
TSi prepared a geotechnical report for use in the design and construction of the project. The report contained the Logs of Boring and laboratory test results for the project, documentation of the field exploration and laboratory test procedures, and a discussion of the site geology and the subsurface conditions encountered. The report also presented our conclusions and recommendations for the design and construction of the proposed facilities.
Evelyn's 'Hospice House' at Barnes Jewish West Campus
Client: BJC Health Services
Location: Creve Coeur, Missouri
TSi provided material and special inspections services during the construction of the new hospice house building, located at the BJWC Campus, in Creve Coeur, Missouri. TSi testing services included soil, concrete, asphalt and steel materials. The new building will be approximately 19,000 square feet, one-story wood framed, slab-on-grade structure, located at the southwest corner of the Barnes Jewish West Campus.
Radiation Oncology Center - St. Louis University Hospital
Client: SSM Health
Location: St. Louis, Missouri
TSi provided material and special inspections services during the construction of the new Radiation Oncology Center, located at the SSM campus at St. Louis University Hospital, in St. Louis, Missouri. TSi testing services included soil, concrete, asphalt and steel materials. The new building will be approximately 19,000 square feet, one-story wood framed, slab-on-grade structure, located at the southwest corner of the SSM Campus.
North Parking Garage Expansion
Client: BJC Healthcare
Location: St. Louis, Missouri
TSi provided materials testing services for the expansion of a five-story, 102-vehicle parking facility. Soil, fill, and backfill were evaluated using Proctor tests, sieve analyses, and Atterberg
limits.
TSi performed quality assurance tests on concrete, including slump, air entrainment, temperature, and unit weight. Compressive strength tests on concrete test cylinders were
also performed. TSi observed the placement of steel reinforcements and tendons for posttensioned concrete slabs and documented the tensioning of tendons.
Daisy Medical Research Center
Client: Saint Louis University
Location: St. Louis, Missouri
TSi provided materials testing services for the construction of a state-of-the-art, “Green”, 10-story, 206,000-square-foot facility on a 9-acre site. The $82 million building is connected by a covered walkway to the School of Medicine. This research facility had been designed as a place where scientists can research discoveries in the areas of cancer, liver disease, heart/lung disease, aging and brain disease and vaccine development.
TSi observed the installation of drilled pier foundations including verification of limestone bearing material and the placement of steel reinforcement and concrete. TSi also observed and tested the placement and compaction of fill and backfill, and performed quality assurance testing of concrete for the fundations and structures.
East Medical Building - DePaul Health Center
Client: SSM Health
Location: Bridgeton, Missouri
TSi is currently performed construction materials testing on fireproofing and additional materials on the addition to the East Medical Building at DePaul Health Center in Bridgeton, Missouri.